{"id":303,"date":"2026-09-08T06:49:55","date_gmt":"2026-09-07T23:49:55","guid":{"rendered":"https:\/\/ipama.id\/?p=303"},"modified":"2026-09-28T09:30:51","modified_gmt":"2026-09-28T02:30:51","slug":"mengenal-lebih-dekat-aplikasi-managemen-open-project","status":"publish","type":"post","link":"https:\/\/ipama.id\/en\/mengenal-lebih-dekat-aplikasi-managemen-open-project\/","title":{"rendered":"Mengenal Lebih Dekat Aplikasi Managemen OpenProject"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Oleh : Bidang IT Dan Medsos IPAMA<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1408\" height=\"768\" src=\"https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project.jpg 1408w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-18x10.jpg 18w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-150x82.jpg 150w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-450x245.jpg 450w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-1200x655.jpg 1200w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-768x419.jpg 768w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-300x164.jpg 300w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Mengenal-Lebih-Dekat-Aplikasi-Managemen-Open-Project-1024x559.jpg 1024w\" sizes=\"(max-width: 1408px) 100vw, 1408px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><\/h3>\n\n\n\n<div>Blocksy: Share Box<\/div>\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1. PENDAHULUAN &amp; GAMBARAN UMUM<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>OpenProject<\/strong> adalah platform manajemen proyek berbasis web bersumber terbuka (<em>open-source<\/em>) yang dirancang untuk mendukung seluruh siklus hidup proyek\u2014mulai dari inisiasi, perencanaan, pelaksanaan, hingga penutupan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Fitur Utama OpenProject:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Kolaborasi Tim:<\/strong> Manajemen tugas terpusat dengan komentar, notifikasi, dan rekam jejak aktivitas.<\/li>\n\n\n\n<li><strong>Perencanaan Klasik &amp; Agile:<\/strong> Mendukung <em>Gantt Chart<\/em> tradisional dan papan <em>Kanban\/Scrum<\/em>.<\/li>\n\n\n\n<li><strong>Kontrol Finansial:<\/strong> Pencatatan waktu kerja (<em>time logging<\/em>) dan anggaran biaya proyek.<\/li>\n\n\n\n<li><strong>Keamanan Data:<\/strong> Enkripsi tingkat tinggi, kontrol akses berbasis peran (RBAC), dan kepatuhan GDPR.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2. MEMULAI APLIKASI (GETTING STARTED)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2.1 Log In ke Sistem<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Buka peramban web (<em>browser<\/em>) Anda dan akses URL server OpenProject instansi Anda (contoh: <code>https:\/\/perusahaan.com<\/code>).<\/li>\n\n\n\n<li>Masukkan <strong>Username \/ Email<\/strong> dan <strong>Password<\/strong> Anda.<\/li>\n\n\n\n<li>Klik tombol <strong>Sign in<\/strong>.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-ipama wp-block-embed-ipama\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"BKCKtevR5A\"><a href=\"https:\/\/ipama.id\/en\/memanfaatkan-bermedia-sosial-untuk-meningkatkan-pendapatan-ekonomi-keluarga\/\">Memanfaatkan Bermedia Sosial Untuk Meningkatkan Pendapatan Ekonomi Keluarga<\/a><\/blockquote><iframe class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cMemanfaatkan Bermedia Sosial Untuk Meningkatkan Pendapatan Ekonomi Keluarga\u201d \u2014 IPAMA\" src=\"https:\/\/ipama.id\/memanfaatkan-bermedia-sosial-untuk-meningkatkan-pendapatan-ekonomi-keluarga\/embed\/#?secret=XZJYf8SGwM#?secret=BKCKtevR5A\" data-secret=\"BKCKtevR5A\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2.2 Navigasi Dasbor Utama (Dashboard)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Setelah berhasil masuk, Anda akan diarahkan ke Dasbor Utama yang terdiri dari:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Header Menu (Atas):<\/strong> Akses cepat ke notifikasi (ikon lonceng), menu profil, pencarian global, dan tombol buat proyek baru (+).<\/li>\n\n\n\n<li><strong>Sidebar Menu (Kiri):<\/strong> Menu navigasi kontekstual yang berubah sesuai dengan proyek aktif yang sedang Anda buka.<\/li>\n\n\n\n<li><strong>Main Widget Area (Tengah):<\/strong> Ringkasan tugas Anda, berita proyek, dan kalender aktivitas.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3. MANAJEMEN PROYEK (PROJECT MANAGEMENT)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3.1 Membuat Proyek Baru<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Pada pojok kanan atas dasbor, klik ikon <strong><code>+ Project<\/code><\/strong>.<\/li>\n\n\n\n<li>Isi formulir pembuatan proyek:\n<ul class=\"wp-block-list\">\n<li><strong>Name:<\/strong> Nama proyek (wajib diisi).<\/li>\n\n\n\n<li><strong>Description:<\/strong> Deskripsi atau tujuan proyek.<\/li>\n\n\n\n<li><strong>Subproject of:<\/strong> Pilih jika proyek ini merupakan bagian dari proyek induk (<em>parent project<\/em>).<\/li>\n\n\n\n<li><strong>Status:<\/strong> Tentukan status awal (misalnya: <em>ON TRACK<\/em>).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Klik <strong>Save<\/strong>.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3.2 Mengelola Anggota Tim (Members)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Masuk ke proyek yang telah dibuat, lalu pilih menu <strong>Members<\/strong> pada sidebar kiri.<\/li>\n\n\n\n<li>Klik tombol <strong><code>+ Member<\/code><\/strong> di pojok kanan atas.<\/li>\n\n\n\n<li>Masukkan nama atau alamat email pengguna yang sudah terdaftar.<\/li>\n\n\n\n<li>Pilih <strong>Role (Peran)<\/strong> pengguna tersebut (contoh: <em>Project Manager, Member, Reader<\/em>).<\/li>\n\n\n\n<li>Klik <strong>Add<\/strong>.<\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4. MANAJEMEN TUGAS &amp; ALUR KERJA (WORK PACKAGES)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Work Packages<\/em> adalah istilah OpenProject untuk mencakup semua jenis item kerja seperti Tugas (<em>Task<\/em>), <em>Bug<\/em>, <em>Feature<\/em>, <em>Milestone<\/em>, atau <em>Phase<\/em>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4.1 Membuat Work Package Baru<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Buka proyek Anda, klik menu <strong>Work Packages<\/strong> pada sidebar kiri.<\/li>\n\n\n\n<li>Klik tombol <strong><code>+ Create<\/code><\/strong> di kanan atas, lalu pilih tipe paket kerja (misalnya: <strong>Task<\/strong>).<\/li>\n\n\n\n<li>Isi informasi detail tugas:\n<ul class=\"wp-block-list\">\n<li><strong>Subject:<\/strong> Judul tugas.<\/li>\n\n\n\n<li><strong>Description:<\/strong> Detail instruksi tugas.<\/li>\n\n\n\n<li><strong>Assignee:<\/strong> Orang yang bertanggung jawab mengerjakan tugas.<\/li>\n\n\n\n<li><strong>Status:<\/strong> Status awal tugas (otomatis terisi <em>New<\/em>).<\/li>\n\n\n\n<li><strong>Start Date &amp; Due Date:<\/strong> Tanggal mulai dan tenggat waktu.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Klik <strong>Save<\/strong>.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4.2 Mengubah Status &amp; Alur Kerja<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Untuk memperbarui progres kerja, buka <em>Work Package<\/em> yang dituju, klik pada kolom <strong>Status<\/strong>, lalu ubah sesuai dengan alur kerja yang berjalan (contoh: <em>New \u2192 In Progress \u2192 Closed<\/em>). Anda wajib menambahkan komentar penjelasan pada kolom aktivitas sebelum menyimpan perubahan status.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Baca Juga : <a href=\"https:\/\/ipama.id\/en\/membangun-kesadaran-etika-bermedia-sosial-di-era-digital\/\">https:\/\/ipama.id\/membangun-kesadaran-etika-bermedia-sosial-di-era-digital\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5. PERENCANAAN VISUAL (GANTT CHART &amp; AGILE BOARD)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5.1 Menggunakan Gantt Chart (Perencanaan Klasik)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Klik menu <strong>Work Packages<\/strong> pada proyek Anda.<\/li>\n\n\n\n<li>Aktifkan mode visual dengan mengklik tombol ikon diagram batang (<strong>Gantt Chart View<\/strong>) di kanan atas tabel.<\/li>\n\n\n\n<li><strong>Membuat Hubungan (Dependency):<\/strong> Tarik garis dari ujung batang satu tugas ke batang tugas lainnya untuk membuat hubungan ketergantungan (misalnya: <em>Tugas B baru bisa dimulai setelah Tugas A selesai<\/em>).<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5.2 Menggunakan Agile Board (Kanban\/Scrum)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Klik menu <strong>Agile Boards<\/strong> pada sidebar kiri.<\/li>\n\n\n\n<li>Klik <strong><code>+ New Board<\/code><\/strong>, pilih tipe papan:\n<ul class=\"wp-block-list\">\n<li><strong>Basic Board:<\/strong> Berdasarkan status tugas (<em>To Do, In Progress, Done<\/em>).<\/li>\n\n\n\n<li><strong>Assignee Board:<\/strong> Berdasarkan pembagian kerja anggota tim.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Kelola tugas dengan metode <em>drag-and-drop<\/em> (seret dan lepas) kartu tugas dari satu kolom ke kolom berikutnya sesuai perkembangan riil di lapangan.<\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6. PELACAKAN WAKTU &amp; BIAYA (TIME &amp; COST TRACKING)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6.1 Mencatat Waktu Kerja (Log Time)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Buka <em>Work Package<\/em> (tugas) yang sedang atau telah Anda kerjakan.<\/li>\n\n\n\n<li>Klik tombol titik tiga <strong>(&#8230;)<\/strong> di kanan atas detail tugas, lalu pilih <strong>Log time<\/strong>.<\/li>\n\n\n\n<li>Isi formulir:\n<ul class=\"wp-block-list\">\n<li><strong>Date:<\/strong> Tanggal pengerjaan.<\/li>\n\n\n\n<li><strong>Hours:<\/strong> Durasi waktu kerja (misal: <em>2.5<\/em> jam).<\/li>\n\n\n\n<li><strong>Activity:<\/strong> Jenis aktivitas (misal: <em>Development, Management<\/em>).<\/li>\n\n\n\n<li><strong>Comment:<\/strong> Detail apa saja yang dikerjakan selama durasi tersebut.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Klik <strong>Save<\/strong>.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6.2 Melihat Laporan Waktu &amp; Biaya<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Pilih menu <strong>Time and costs<\/strong> pada sidebar kiri proyek.<\/li>\n\n\n\n<li>Di sini Anda dapat memfilter laporan berdasarkan rentang waktu, anggota tim, atau jenis tugas.<\/li>\n\n\n\n<li>Hasil laporan dapat diekspor ke format <strong>CSV<\/strong> atau <strong>PDF<\/strong> dengan mengklik opsi <em>Export<\/em> di kanan atas.<\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\" style=\"grid-template-columns:37% auto\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"148\" height=\"148\" src=\"https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Openproject.jpg\" alt=\"\" class=\"wp-image-307 size-full\" srcset=\"https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Openproject.jpg 148w, https:\/\/ipama.id\/wp-content\/uploads\/2026\/09\/Openproject-12x12.jpg 12w\" sizes=\"(max-width: 148px) 100vw, 148px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">&#8220;<strong>OpenProject Aplikasi open source<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>yang simpel dan user frendly<\/strong>&#8220;<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7. PANDUAN ADMINISTRATOR (PENGATURAN SISTEM)<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Bagian ini khusus untuk pengguna dengan hak akses <strong>Administrator<\/strong>.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7.1 Manajemen Pengguna (Users)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Klik ikon <strong>Gigi Roda (Administration)<\/strong> di pojok kanan atas layar.<\/li>\n\n\n\n<li>Pilih menu <strong>Users &amp; Permissions<\/strong> \u2192 <strong>Users<\/strong>.<\/li>\n\n\n\n<li>Klik <strong><code>+ New User<\/code><\/strong> untuk menambahkan pengguna baru secara manual, atau atur metode otentikasi eksternal (LDAP\/Active Directory) pada menu <em>Authentication<\/em>.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7.2 Konfigurasi Alur Kerja Global (Workflows)<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Masuk ke halaman <strong>Administration<\/strong>, lalu pilih <strong>Work Packages<\/strong> \u2192 <strong>Workflows<\/strong>.<\/li>\n\n\n\n<li>Pilih <strong>Role<\/strong> dan <strong>Type<\/strong> tugas yang ingin diatur alur kerjanya.<\/li>\n\n\n\n<li>Centang matriks kotak transisi status untuk menentukan status apa saja yang boleh diubah oleh peran (<em>Role<\/em>) tertentu (misalnya: <em>Hanya Project Manager yang boleh mengubah status tugas menjadi &#8220;Approved&#8221;<\/em>).<\/li>\n\n\n\n<li>Klik <strong>Save<\/strong>.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>8. Manfaat OpenProject<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">8.1. Sentralisasi dan Transparansi Data Proyek<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Satu Sumber Data (<em>Single Source of Truth<\/em>):<\/strong> Semua dokumen, tugas, tenggat waktu, dan komunikasi tim disimpan dalam satu platform terpusat. Ini mengeliminasi risiko tumpang-tindih informasi akibat penggunaan banyak aplikasi terpisah.<\/li>\n\n\n\n<li><strong>Transparansi Alur Kerja:<\/strong> Setiap anggota tim dapat melihat siapa yang sedang mengerjakan apa, kapan tugas harus selesai, dan apa saja hambatan (<em>blockers<\/em>) yang sedang dihadapi secara <em>real-time<\/em>.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">8.2. Fleksibilitas Metodologi Kerja (Hibrida)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dukungan Manajemen Klasik:<\/strong> Dilengkapi dengan fitur <strong>Gantt Chart<\/strong> interaktif untuk memetakan lini masa proyek, ketergantungan antar-tugas (<em>dependencies<\/em>), dan jalur kritis (<em>critical path<\/em>) untuk proyek-proyek tradisional (Waterfall).<\/li>\n\n\n\n<li><strong>Dukungan Manajemen Agile:<\/strong> Menyediakan papan <strong>Kanban dan Scrum<\/strong> (Agile Boards) untuk tim yang membutuhkan fleksibilitas tinggi, siklus pengembangan cepat (sprint), dan manajemen <em>backlog<\/em> yang dinamis.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">8.3. Kontrol Finansial dan Sumber Daya yang Akurat<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Pelacakan Waktu (<em>Time Tracking<\/em>):<\/strong> Anggota tim dapat mencatat waktu kerja aktual (<em>log time<\/em>) langsung di bawah tugas yang relevan, memudahkan evaluasi produktivitas.<\/li>\n\n\n\n<li><strong>Manajemen Anggaran &amp; Biaya:<\/strong> Memungkinkan manajer proyek untuk memantau pengeluaran operasional, membandingkan anggaran rencana dengan biaya aktual, serta memproyeksikan keuntungan atau kerugian secara berkala.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">8.4. Kedaulatan dan Keamanan Data Tingkat Tinggi<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Opsi <em>On-Premise (Self-Hosted<\/em>):<\/strong> OpenProject dapat diinstal di server internal perusahaan Anda sendiri. Manfaat ini sangat krusial bagi instansi pemerintah, perbankan, atau perusahaan medis yang memiliki regulasi ketat terkait privasi data.<\/li>\n\n\n\n<li><strong>Kepatuhan Regulasi Internasional:<\/strong> Sistem ini dirancang dengan standar kepatuhan keamanan yang ketat, termasuk <strong>GDPR<\/strong> (regulasi perlindungan data Uni Eropa).<\/li>\n\n\n\n<li><strong>Kontrol Akses Berbasis Peran (RBAC):<\/strong> Administrator dapat mengatur hak akses secara spesifik (siapa yang boleh melihat, mengedit, atau menghapus data) berdasarkan peran pengguna di dalam proyek.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">8.5. Efisiensi Biaya (Ekonomis)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Berbasis <em>Open-Source<\/em>:<\/strong> Versi komunitas (<em>Community Edition<\/em>) dapat digunakan secara gratis tanpa biaya lisensi per pengguna, menjadikannya solusi yang sangat hemat biaya untuk organisasi skala besar atau instansi dengan keterbatasan anggaran software.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">8.6. Otomatisasi dan Kustomisasi Alur Kerja<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Custom Fields &amp; Workflows:<\/strong> Bentuk formulir, tipe tugas (<em>Work Packages<\/em>), dan transisi status (misalnya dari <em>New -&gt; In Progress -&gt; Approved<\/em>) dapat disesuaikan sepenuhnya agar cocok dengan Standard Operating Procedure (SOP) internal organisasi Anda.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Oleh : Bidang IT Dan Medsos IPAMA 1. PENDAHULUAN &amp; GAMBARAN UMUM OpenProject adalah platform manajemen proyek berbasis web bersumber terbuka (open-source) yang dirancang untuk mendukung seluruh siklus hidup proyek\u2014mulai dari inisiasi, perencanaan, pelaksanaan, hingga penutupan. Fitur Utama OpenProject: 2. MEMULAI APLIKASI (GETTING STARTED) 2.1 Log In ke Sistem 2.2 Navigasi Dasbor Utama (Dashboard) Setelah<\/p>","protected":false},"author":3,"featured_media":304,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"page_builder":"","footnotes":""},"categories":[9],"tags":[119,117,116,23,115,118],"class_list":["post-303","post","type-post","status-publish","format-standard","has-post-thumbnail","category-opini","tag-altasian","tag-alur-kerja","tag-bidang","tag-ipama","tag-open-project","tag-trello"],"_links":{"self":[{"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/posts\/303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/comments?post=303"}],"version-history":[{"count":4,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/posts\/303\/revisions"}],"predecessor-version":[{"id":571,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/posts\/303\/revisions\/571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/media\/304"}],"wp:attachment":[{"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/media?parent=303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/categories?post=303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ipama.id\/en\/wp-json\/wp\/v2\/tags?post=303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}